Connect with us

Telecom

MDXI Launches West Africa’s Carrier-Neutral Internet Exchange (IX) with Asteroid

Published

on

Kindly share this post

West Africa’s largest data centre provider, MDXI and global IXP platform provider, Asteroid have partnered to launch a carrier-neutral Internet Exchange Point (IXP) for West Africa. The West African Internet Exchange (WAF-IX), is based on Asteroid’s lightweight design and will be located in MDXI’s Tier III Data Centre, in Lagos, Nigeria, West Africa’s biggest economic hub.

 

Outlining the three major objectives for WAF-IX as accessibility, lower costs and reduced latency for Internet users in West Africa, Vremudia Oghene-Ruemu, Product Manager, MDXI/Peering Coordinator, WAF-IX, stressed that the new Internet Exchange would complement national IXPs, improve regional traffic and ultimately foster the attainment of the digital economy across West Africa.

 

“Given the size of its markets and status as home to some of Africa’s biggest economies, West Africa is uniquely positioned to scale up its digital transformation efforts via Internet traffic growth. The West African Internet Exchange, hosted within our globally certified Data Centre will significantly improve traffic exchange and localization within West Africa, with benefits of reduced latency, improved speed and better quality of service to end users. WAF-IX will enable more Africa-focused global and local carriers take advantage of the region’s growing Internet penetration to enable services originating and terminating within the region”, he says.

 

West African Internet Exchange will facilitate improved interconnection, collaboration and peering between players with access to MDXI’s Tier III data centre, and will enable an ecosystem that allows customers connect to multiple networks, cloud and content providers.

 

Using the lean and efficient Asteroid IXP platform, WAF-IX will enable service providers operate more efficiently with the delivery of enhanced end-to-end network performance, while reducing overall IP Transit costs.

 

Remco van Mook, CEO, Asteroid said: “West Africa’s digital economy is on the rise, but huge gaps still exist in in-country interconnection. We believe that the Internet sector across West Africa has incredible potential for growth and will be greatly enabled by the West African Internet Exchange. Together, we can provide a gateway for West African networks to peer with international content providers.”

 

WAF-IX host, MDXI is West Africa’s largest data centre provider offering colocation, interconnection and cloud services and is the region’s most connected data centre, with proven competence to interconnect OTTs and major network, content and financial services providers.


Kindly share this post

Nigeria CommunicationsWeek believes that technology makes life more exciting and helps improve the lives of people around Nigeria and indeed the world. So since 2007, we have devoted our energy to independent reportage of technology and how they affect lives.

Continue Reading
Advertisement
Comments

Telecom

WIOCC, Galaxy Backbone Partner to Drive High-Speed Internet Connectivity Across Nigeria

Published

on

Kindly share this post

WIOCC, Africa’s Carriers’ Carrier, has partnered with Galaxy Backbone Limited (GBB), a leading digital infrastructure and shared services provider, in a strategic infrastructure collaboration aimed at enhancing high-speed internet connectivity across the country. This partnership supports digital inclusion and drives Nigeria’s digital transformation.

By combining WIOCC’s extensive wholesale fibre network and expertise with GBB’s national fibre footprint, the collaboration will improve scalability, efficiency and service delivery for businesses and government institutions. It also aims to bridge the digital divide by expanding broadband access to underserved regions and foster partnerships with Mobile Network Operators (MNOs) to advance Nigeria’s digital economy.

A signing ceremony was held at Galaxy Backbone’s Corporate headquarters in Abuja, with Darren Bedford, Group Chief Development Officer at WIOCC and Managing Director/CEO of Galaxy Backbone, Professor Ibrahim A. Adeyanju.

They highlighted the strategic alignment of both organizations in driving digital transformation to accelerate Nigeria’s digital future, setting a benchmark for innovation and connectivity that addresses the evolving needs of Nigeria’s digital ecosystem..

Professor Ibrahim A. Adeyanju stated, “Our mission is to provide robust digital infrastructure that underpins Nigeria’s digital economy. This partnership with WIOCC is a testament to our commitment to enabling digital inclusion and providing a platform for collaboration that transforms how businesses, governments and communities operate in today’s world.”

Darren Bedford added, “This collaboration with Galaxy Backbone reflects our shared vision for driving digital transformation. Together, we are creating a platform for innovation and economic growth that will benefit the country with world-class connectivity.”


Kindly share this post
Continue Reading

Telecom

Schneider Reiterates Commitment to Accelerate Data Centre Market

Published

on

Kindly share this post

Schneider Electric, has reiterated its commitment to accelerate growth in the data centre market across East and West Africa regions that have become vital due to rapid digitalisation and increasing Internet penetration.

Commitment on the company’s drive, End User Sales Director, Anglophone Africa, Schneider Electric, Rohan de Beer, said, the African data centre market is witnessing unprecedented growth, creating a fertile ground for resellers and distributors to enhance their capabilities and foster stronger relationships with local end users.

De Beer explained that previously, Schneider Electric relied solely on external channels for market development, which sometimes led to missed opportunities and increased competition.

He noted that the new dual approach adopted by the firm seeks to address these gaps by enabling closer engagement with end users to influence technology decisions and secure a larger share of the market.

He added, “Crucially, these engagements will still be fulfilled through Schneider Electric’s extensive channel network.This strategy allows us to influence project lifecycles at an earlier stage while maintaining our channel-driven fulfilment model,” explained De Beer. “Our goal isn’t to increase direct business but to expand our market presence and share while empowering partners.”

“In addition to self-paced learning resources, we are hosting instructor-led training sessions across the Anglophone cluster. The first half of the year saw successful training completions in East, West, and Southern Africa, focusing on technical solutions for partners and distributors,” De Beer added.


Kindly share this post
Continue Reading

Telecom

Meta Plans $10Bn Subsea Cable Project to Boost Connectivity

Published

on

Kindly share this post

Meta, the parent company of Facebook, Instagram, and WhatsApp, reportedly plans to invest over $10 billion in a privately owned subsea cable network spanning more than 40,000 kilometers.

Meta Plans $10Bn Subsea Cable Project to Boost Connectivity

This ambitious project aims to enhance Meta’s control over its vast internet traffic, reduce dependence on telecommunications companies, and mitigate geopolitical risks.

The proposed route is expected to connect the U.S. East Coast to India via South Africa, and then from India to the U.S. West Coast through Australia, forming a “W” shape around the globe.

The initiative reflects Meta’s strategic move to secure its infrastructure amid growing geopolitical tensions and concerns about the vulnerability of undersea cable.

According to sources close to the company, the initiative, still in its early phases, would be Meta’s first fully owned and operated subsea cable.

This bold move underscores Meta’s focus on strengthening infrastructure to support its platforms, which generate 10% of fixed and 22% of mobile internet traffic globally, as first reported by TechCrunch.

Sunil Tagare, industry expert, who reported the plans in October, noted that the project’s initial budget of $2 billion will likely increase significantly.

“This is a monumental project in both investment and scale. The shortage of cable-laying ships and resources could lead Meta to build the cable in phases,” Tagare explained.

Although Meta has yet to publicly confirm the plans, an official announcement regarding the route, capacity, and objectives is anticipated in early 2025.

Logistical Hurdles: Meta faces difficulties securing the resources needed for a project of this scale. Cable-laying ships are in limited supply, with tech giants like Google already monopolising contracts with firms such as SubCom.

Tight Market Conditions: Ranulf Scarborough, a submarine cable industry analyst, highlighted the constraints. “The tight market for specialised resources means Meta may need to adopt a phased construction approach, potentially extending the timeline.”

Meta’s infrastructure initiatives are led by Santosh Janardhan, its head of global infrastructure. Reports suggest the project is being developed from its South African operations, indicating the growing significance of emerging markets in Meta’s strategy.

Traditionally dominated by telecom carriers, subsea cable construction has seen a shift as content-driven companies like Meta seek greater control over the infrastructure delivering their services.

If successful, this cable will strengthen Meta’s ability to handle data traffic independently, reduce reliance on shared networks, and unlock opportunities in underserved regions.

 


Kindly share this post
Continue Reading

Trending